<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Gyron Blog &#187; G1</title>
	<atom:link href="http://blog.gyron.net/tag/g1/feed/" rel="self" type="application/rss+xml" />
	<link>http://blog.gyron.net</link>
	<description>Purveyors of fine quality datacentre services since 2000.</description>
	<lastBuildDate>Tue, 11 May 2010 16:56:38 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Brief photo tour of the LHC</title>
		<link>http://blog.gyron.net/bloggery/brief-photo-tour-of-the-lhc/</link>
		<comments>http://blog.gyron.net/bloggery/brief-photo-tour-of-the-lhc/#comments</comments>
		<pubDate>Sun, 06 Jan 2008 15:52:00 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[General Bloggery]]></category>
		<category><![CDATA[Pictures]]></category>
		<category><![CDATA[G1]]></category>
		<category><![CDATA[LHC]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=35</guid>
		<description><![CDATA[A few customers have asked for some more pictures of our facilities at the London Hosting Center, so I&#8217;ve uploaded some here.
Related PostsGyron announces availability of more than 60 additional rack footprints in the London DocklandsTime-lapse video showing LHC 2nd floor rack fit-outGyron selects Telstra Europe as Facilities Partner]]></description>
			<content:encoded><![CDATA[<p style="text-align: left;">A few customers have asked for some more pictures of our facilities at the London Hosting Center, so I&#8217;ve uploaded some here.</p>
<div id="attachment_32" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/1.jpg" rel="lightbox[35]"><img class="size-medium wp-image-32" title="Exterior of the LHC" src="http://blog.gyron.net/wp-content/uploads/1.jpg" alt="Exterior of the LHC" width="480" height="319" /></a><p class="wp-caption-text">Exterior of the LHC</p></div>
<div id="attachment_33" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/2.jpg" rel="lightbox[35]"><img class="size-medium wp-image-33" title="Comprehensive digital IP CCTV system" src="http://blog.gyron.net/wp-content/uploads/2.jpg" alt="Comprehensive digital IP CCTV system" width="480" height="319" /></a><p class="wp-caption-text">Comprehensive digital IP CCTV system</p></div>
<div id="attachment_34" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/4.jpg" rel="lightbox[35]"><img class="size-medium wp-image-34" title="View through the door to the G1 hosting suite" src="http://blog.gyron.net/wp-content/uploads/4.jpg" alt="View through the door to the G1 hosting suite" width="480" height="319" /></a><p class="wp-caption-text">View through the door to the G1 hosting suite</p></div>
<div id="attachment_36" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5.jpg" rel="lightbox[35]"><img class="size-medium wp-image-36" title="Computerised fire control panel" src="http://blog.gyron.net/wp-content/uploads/5.jpg" alt="Computerised fire control panel" width="480" height="319" /></a><p class="wp-caption-text">Computerised fire control panel</p></div>
<div id="attachment_38" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/7.jpg" rel="lightbox[35]"><img class="size-medium wp-image-38" title="Close up of FM200 gas cylinder" src="http://blog.gyron.net/wp-content/uploads/7.jpg" alt="Close up of FM200 gas cylinder" width="480" height="319" /></a><p class="wp-caption-text">Close up of FM200 gas cylinder</p></div>
<div id="attachment_41" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/10.jpg" rel="lightbox[35]"><img class="size-medium wp-image-41" title="Overhead data cabling" src="http://blog.gyron.net/wp-content/uploads/10.jpg" alt="Overhead data cabling" width="480" height="319" /></a><p class="wp-caption-text">Overhead data cabling</p></div>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/press-releases/gyron-announces-availability-of-more-than-60-additional-rack-footprints-in-the-london-docklands/" title="Gyron announces availability of more than 60 additional rack footprints in the London Docklands">Gyron announces availability of more than 60 additional rack footprints in the London Docklands</a></li><li><a href="http://blog.gyron.net/news/time-lapse-video-showing-lhc-2nd-floor-rack-fit-out/" title="Time-lapse video showing LHC 2nd floor rack fit-out">Time-lapse video showing LHC 2nd floor rack fit-out</a></li><li><a href="http://blog.gyron.net/press-releases/gyron-selects-telstra-europe-as-facilities-partner/" title="Gyron selects Telstra Europe as Facilities Partner">Gyron selects Telstra Europe as Facilities Partner</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/bloggery/brief-photo-tour-of-the-lhc/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Gyron announces availability of more than 60 additional rack footprints in the London Docklands</title>
		<link>http://blog.gyron.net/press-releases/gyron-announces-availability-of-more-than-60-additional-rack-footprints-in-the-london-docklands/</link>
		<comments>http://blog.gyron.net/press-releases/gyron-announces-availability-of-more-than-60-additional-rack-footprints-in-the-london-docklands/#comments</comments>
		<pubDate>Wed, 15 Aug 2007 15:36:21 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Press Releases]]></category>
		<category><![CDATA[expansion]]></category>
		<category><![CDATA[G1]]></category>
		<category><![CDATA[G2]]></category>
		<category><![CDATA[G4]]></category>
		<category><![CDATA[G5]]></category>
		<category><![CDATA[LHC]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=8</guid>
		<description><![CDATA[Gyron Internet Ltd, a leading wholesale and managed services provider for medium sized UK businesses, has announced availability of 16 high specification rack footprints today, with a further 45 footprints availabile within 8 weeks.
See also:
- Gyron colocation services
The racks have been made available by expanding one of Gyron&#8217;s current hosting suites in the London Hosting [...]]]></description>
			<content:encoded><![CDATA[<p>Gyron Internet Ltd, a leading wholesale and managed services provider for medium sized UK businesses, has announced availability of 16 high specification rack footprints today, with a further 45 footprints availabile within 8 weeks.</p>
<p>See also:<br />
- <a href="http://www1.uk.gyron.net/?p=services.colocation" target="_new">Gyron colocation services</a></p>
<p>The racks have been made available by expanding one of Gyron&#8217;s current hosting suites in the London Hosting Centre, and by commisioning a new 120 square meter suite. These racks have been provisioned at the high specification of 16A per footprint, with dedicated N+1 cooling and UPS systems.</p>
<p>These new racks will be supported by Gyron&#8217;s existing 24/7 on-site Network Operating Centre engineers, with a wide range of managed services and connectivity solutions available.</p>
<p><span id="more-8"></span></p>
<p>Notes for Editors:</p>
<p style="text-align: justify;"><strong>About Gyron</strong></p>
<p>Gyron Internet Ltd is a privately owned company founded in 2000, which provides connectivity and outsourced managed hosting for the critical business infrastructure of around 100 small and medium companies, as well as an extensive range of wholesale services to the ISP industry.</p>
<p>Gyron operate their own London metro dark fibre ring, which is capable of delivering over 300Gbps of diverse connectivity. Their main hosting suites and 24/7 NOC are at Telstra&#8217;s London Hosting Centre, with additional POPs in all of the major London hosting facilities.</p>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/news/pictures-of-new-hosting-suite/" title="Pictures of new G4/G5 hosting suite">Pictures of new G4/G5 hosting suite</a></li><li><a href="http://blog.gyron.net/news/details-of-new-g4g5-hosting-suite/" title="Details of new G4/G5 hosting suite">Details of new G4/G5 hosting suite</a></li><li><a href="http://blog.gyron.net/news/time-lapse-video-showing-lhc-2nd-floor-rack-fit-out/" title="Time-lapse video showing LHC 2nd floor rack fit-out">Time-lapse video showing LHC 2nd floor rack fit-out</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/press-releases/gyron-announces-availability-of-more-than-60-additional-rack-footprints-in-the-london-docklands/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Time-lapse video showing LHC 2nd floor rack fit-out</title>
		<link>http://blog.gyron.net/news/time-lapse-video-showing-lhc-2nd-floor-rack-fit-out/</link>
		<comments>http://blog.gyron.net/news/time-lapse-video-showing-lhc-2nd-floor-rack-fit-out/#comments</comments>
		<pubDate>Fri, 26 Jan 2007 14:37:56 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Gyron News]]></category>
		<category><![CDATA[Videos]]></category>
		<category><![CDATA[expansion]]></category>
		<category><![CDATA[G1]]></category>
		<category><![CDATA[G2]]></category>
		<category><![CDATA[LHC]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=11</guid>
		<description><![CDATA[We recently fitted out around 2,200 sq ft of new datacenter space at the London Hosting Center.
After the core plant equipment (e.g. air conditioning down-flow units, FM200 fire suppression etc) was installed, the IP CCTV cameras went up and we were able to grab images to make the following time-lapse movie showing all 68 APC [...]]]></description>
			<content:encoded><![CDATA[<p>We <a href="/?p=7">recently fitted out</a> around 2,200 sq ft of new datacenter space at the London Hosting Center.</p>
<p>After the core plant equipment (e.g. air conditioning down-flow units, FM200 fire suppression etc) was installed, the IP CCTV cameras went up and we were able to grab images to make the following time-lapse movie showing all 68 APC NetShelter enclosures being installed over a 4 day period:</p>
<a href="http://blog.gyron.net/news/time-lapse-video-showing-lhc-2nd-floor-rack-fit-out/" title="Watch Flash video!"><img src="http://blog.gyron.net/media/lhc_2ndfloor_timelapse.jpg" alt="preview image"/></a>
<p>Thanks to all of our techs on-site and our fit-out contractors for the hard work getting this new suite online!</p>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/press-releases/gyron-announces-availability-of-more-than-60-additional-rack-footprints-in-the-london-docklands/" title="Gyron announces availability of more than 60 additional rack footprints in the London Docklands">Gyron announces availability of more than 60 additional rack footprints in the London Docklands</a></li><li><a href="http://blog.gyron.net/press-releases/gyron-selects-telstra-europe-as-facilities-partner/" title="Gyron selects Telstra Europe as Facilities Partner">Gyron selects Telstra Europe as Facilities Partner</a></li><li><a href="http://blog.gyron.net/bloggery/brief-photo-tour-of-the-lhc/" title="Brief photo tour of the LHC">Brief photo tour of the LHC</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/news/time-lapse-video-showing-lhc-2nd-floor-rack-fit-out/feed/</wfw:commentRss>
		<slash:comments>5</slash:comments>
		</item>
		<item>
		<title>Gyron selects Telstra Europe as Facilities Partner</title>
		<link>http://blog.gyron.net/press-releases/gyron-selects-telstra-europe-as-facilities-partner/</link>
		<comments>http://blog.gyron.net/press-releases/gyron-selects-telstra-europe-as-facilities-partner/#comments</comments>
		<pubDate>Wed, 06 Sep 2006 14:34:19 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Press Releases]]></category>
		<category><![CDATA[expansion]]></category>
		<category><![CDATA[G1]]></category>
		<category><![CDATA[G2]]></category>
		<category><![CDATA[LHC]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=7</guid>
		<description><![CDATA[Gyron Internet Ltd, a leading wholesale and managed services provider for medium sized UK businesses, has signed a long-term, multi-million pound contract with leading business telecoms service provider, Telstra Europe, to run its main hosting facilities in Telstra&#8217;s datacentre in London&#8217;s Docklands.
See also:
- Light Reading
- Telstra Europe   press release
Gyron&#8217;s primary objective in changing [...]]]></description>
			<content:encoded><![CDATA[<p>Gyron Internet Ltd, a leading wholesale and managed services provider for medium sized UK businesses, has signed a long-term, multi-million pound contract with leading business telecoms service provider, Telstra Europe, to run its main hosting facilities in Telstra&#8217;s datacentre in London&#8217;s Docklands.</p>
<p>See also:<br />
- <a href="http://www.lightreading.com/document.asp?doc_id=118592&amp;WT.svl=wire1_4" target="_new">Light Reading</a><br />
- <a href="http://www.telstra-international.co.uk/about-us/news/gyron-selects-telstra-europe-as-facilities-partner-to-improve-service-and-reduce-costs/?searchterm=gyron" class="broken_link"  target="_new">Telstra Europe   press release</a></p>
<p>Gyron&#8217;s primary objective in changing supplier was to stabilise operational expenditure for both space and power and ensure availability of additional technical space to support anticipated growth. It also required a datacentre with enough on-site office space for its team of Network Operating Centre engineers, who are on call 24 hours a day.</p>
<p>Telstra was selected because of its impressive state-of-the-art Docklands datacentre, its competitive pricing, its strong reputation for hosting and the strength of its account management and technical teams, all of which set it apart from its competitors.</p>
<p>Gyron Internet Ltd was so impressed by Telstra&#8217;s datacentre facility that it took over 200 square metres of technical space in November 2006 &#8211; three times its original requirements, in anticipation of future growth.  The company has since acquired several new customers and is adding another 95 square metres of space, with further capacity for more servers should the expansion continue.</p>
<p>Robin Balen, Director of Gyron commented, &#8220;We were frustrated with the price hikes, lack of expansion room and inconsistent account management with our previous supplier. Telstra offered an excellent long term commercial deal providing us with the stability we required in order to expand our business&#8221;.</p>
<p>&#8220;The support provided by Telstra&#8217;s dedicated team of account and facilities managers was also second to none throughout the initial consultation and fit-out period. This high standard has been maintained now that we are live. Nothing is ever a problem &#8211; even when we had a query at 10pm on the Sunday night before we moved into the datacentre they were happy to help us&#8221;.</p>
<p>Simon Vye, CEO, Telstra Europe, added, &#8220;The demands for hosting, co-location and business continuity services have rapidly increased. The market has become increasingly more competitive and is showing no signs of slowing down. However, there is no excuse for hosting providers to fail on the service levels they provide, or to charge extortionate pricing. We are delighted to have been selected by Gyron on the strengths of our facilities, account management and commercial proposition and look forward to many years of successful partnership&#8221;.</p>
<p><span id="more-7"></span></p>
<p><strong>Media Contacts:</strong></p>
<p><a title="mailto:pr@gyron.net" href="mailto:pr@gyron.net">pr@gyron.net</a></p>
<p>Notes for Editors:</p>
<p style="text-align: justify;"><strong>About Gyron</strong></p>
<p>Gyron Internet Ltd is a privately owned company founded in 2000, which provides connectivity and outsourced managed hosting for the critical business infrastructure of around 100 small and medium companies, as well as an extensive range of wholesale services to the ISP industry.</p>
<p>Gyron operate their own London metro dark fibre ring, which is capable of delivering over 300Gbps of diverse connectivity. Their main hosting suites and 24/7 NOC are at Telstra&#8217;s London Hosting Centre, with additional POPs in all of the major London hosting facilities.</p>
<p style="text-align: justify;"><strong>About Telstra Europe</strong></p>
<p>Telstra Europe is a wholly-owned subsidiary of Telstra Corporation Limited (ASX:TLS). Operational in Europe for over 14 years, Telstra offers an extensive range of voice and data services including total managed network solutions using Global IP-VPN (MPLS), Internet, ATM, Frame Relay, Private Lines, hosting and co-location services and enhanced voice solutions to medium sized business and multinational corporations in the UK. Additional value added services include fully managed CPE, network reporting, consulting, planning, project management, service tools, which enable customers to monitor and view their network status 24/7 and customer support seven days a week.</p>
<p style="text-align: justify;">Delivering connectivity business solutions, value-added services and complex managed IP solutions, Telstra Europe&#8217;s portfolio is complemented by its independently-owned and managed switched network. Switches are located in London, Birmingham and Manchester working alongside 14 co-location points throughout the UK. Additionally, state-of-the-art, resilient datacentres are located in London, Docklands and Cambridge.</p>
<p style="text-align: justify;">Parent company, Telstra Corporation Limited, is a full service global telecommunications company.</p>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/press-releases/gyron-announces-availability-of-more-than-60-additional-rack-footprints-in-the-london-docklands/" title="Gyron announces availability of more than 60 additional rack footprints in the London Docklands">Gyron announces availability of more than 60 additional rack footprints in the London Docklands</a></li><li><a href="http://blog.gyron.net/news/time-lapse-video-showing-lhc-2nd-floor-rack-fit-out/" title="Time-lapse video showing LHC 2nd floor rack fit-out">Time-lapse video showing LHC 2nd floor rack fit-out</a></li><li><a href="http://blog.gyron.net/bloggery/brief-photo-tour-of-the-lhc/" title="Brief photo tour of the LHC">Brief photo tour of the LHC</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/press-releases/gyron-selects-telstra-europe-as-facilities-partner/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
