Tag Archive for 'expansion'

Page 2 of 3

First phase of fibre equipment for new datacentre site delivered

The first phase of the fibre equipment for our new “Centro” datacentre site in Hemel Hempstead arrived at our London offices today.

Fibre equipment delivery arrives on-site

Construction is under way on our new fibre network, consisting of nearly 160km of private dark fibre (G.652 and G655) in a redundant ring connection between two London datacentres (both existing core fibre POPs on our network) and our new Centro site. Latency back to London is predicted to be very low, with 0.3ms on the primary leg, and 0.4ms on the longer secondary leg.

16x10G DWDM mux module

16x10G DWDM multiplexer module

We’re using DWDM technology to multiplex up to 16x10G channels over each fibre pair – giving a total network capacity of 320G. Each 10G channel can be dedicated to a single 10GigE connection for a customer, split up in to multiple 1G channels for 1GigE networking requirements, or can handle multiple Fibre Channel connections for SAN use. The modules contain tunable DWDM lasers, allowing us to configure, in software, what wavelength each module will use on the fibre. This means we can keep one part as a spare and configure it for use on any channel for rapid deployment.

In-line amplifiers

In-line amplifiers

Due to the redundant leg of the fibre ring being a longer distance, we regenerate the signal at a POP site using in-line amplifiers. These boost the signal strength across the entire DWDM channel range. This also gives us the opportunity to insert an add/drop module at this site in the future to bring in additional redundant connectivity outside of London.

Partially populated equipment chassis

Partially populated equipment chassis

The first phase of the equipment is now ready for testing. We will receive delivery of appropriate line cards for customer connections as we need them.

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

Teaser trailer for new Centro datacentre

Stay tuned for more details soon!

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

Pictures of new G4/G5 hosting suite

As promised, now that the rack deployment has been completed, I’ve uploaded a few images of the new suite:

One of 6 redundant downflow air-conditioning units, with FM200 gas fire supression bottles

One of 6 redundant downflow air-conditioning units, with FM200 gas fire suppression

Two additonal DFUs

Two additional DFUs

APC 42U NetShelter SX racks, with overhead cable management ladders and troughs

APC 42U NetShelter SX racks, with overhead cable management ladders and troughs

Looking the other way

Looking the other way

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

Details of new G4/G5 hosting suite

We previously announced that we were adding an additional 45 rack suite to our existing space at the LHC.

G4/G5 Technical Poster

G4/G5 Technical Poster

The M&E fit-out has now been completed on-schedule by our contractors and the area is now ready for our engineers to install the APC racks, power bars, overhead cable trays, fibre interconnects and structured cabling which will turn the area in to usable space for our customers.

G4/G5 new hosting suite, awaiting rack installation

G4/G5 new hosting suite, awaiting rack installation

I’ll upload a few more pictures once the rack fit-out is complete.

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

Gyron announces availability of more than 60 additional rack footprints in the London Docklands

Gyron Internet Ltd, a leading wholesale and managed services provider for medium sized UK businesses, has announced availability of 16 high specification rack footprints today, with a further 45 footprints availabile within 8 weeks.

See also:
- Gyron colocation services

The racks have been made available by expanding one of Gyron’s current hosting suites in the London Hosting Centre, and by commisioning a new 120 square meter suite. These racks have been provisioned at the high specification of 16A per footprint, with dedicated N+1 cooling and UPS systems.

These new racks will be supported by Gyron’s existing 24/7 on-site Network Operating Centre engineers, with a wide range of managed services and connectivity solutions available.

Continue reading ‘Gyron announces availability of more than 60 additional rack footprints in the London Docklands’

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]