Tag Archive for 'centro'

Page 2 of 5

New contact address details for Gyron

Following the opening of Gyron’s new Centro datacentre facility in Hemel Hempstead, our administrative staff have relocated to our new on-site offices. As such, please update your records with our new postal address, to be used for all correspondence (including cheque payments and legal documents):

Gyron Internet Ltd
3 Centro
Boundary Way
Hemel Hempstead
HP2 7SU

All other contact details, including phone numbers, remain the same. We also continue to operate a 24/7 NOC at our on-site offices in the LHC, in London Docklands, to support our customers there.

Please note that the Registered Office for Gyron Internet Ltd has also been updated to the above address.

If you have any queries regarding this change please contact our accounts team on billing@gyron.net or 0845 888 6900 during office hours.

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Gyron’s new Centro datacentre facility featured in HotLINX magazine

Our new Centro facility is featured in the latest edition of the London Internet Exchange’s HotLINX magazine. You can click the image below to see the article, or download the entire magazine here!

Centro feature in HotLINX 18

Centro feature in HotLINX 18

Continue reading ‘Gyron’s new Centro datacentre facility featured in HotLINX magazine’

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro update – Final commissioning works

HV feed from EDF fully tested and energised

HV feed from EDF fully tested and energised

UPS batteries ready for installation and testing

UPS batteries ready for installation and testing

Final UPS connections and testing

Final UPS connections and testing

Access control system installed and tested

Access control system installed and tested

Splicing and testing fibre connections for our DWDM ring

Splicing and testing fibre connections for our DWDM ring

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro update – Final air conditioning works

Finalising lagging for the chilled water pipework

Finalising lagging for the chilled water pipework

Setting flow rates for the chilled water valves

Setting flow rates for the chilled water valves

Commissioning the air conditioning chillers

Commissioning the air conditioning chillers

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro update – HV transformer installation and chiller pipework connections

3MVA HV transformer installed within secure compound

3MVA HV transformer installed within secure compound

HV feed from our dedicated substation being terminated

HV feed from our dedicated substation being terminated

First of 24 LV cables connecting the transformer and switchgear panels

First of 24 LV cables connecting the transformer and switchgear panels

Final connections being made on chilled water pipework

Final connections being made on chilled water pipework

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro update – LV power connections

LV cable ready for installation

LV cable ready for installation

Cables ready for 2,500A interconnect to Suite 1 LV panel

Cables ready for 2,500A interconnect to Suite 1 LV panel

2,500A interconnect between switchgear panels installed

2,500A interconnect between switchgear panels installed

LV distribution cables installed on to heavy duty traywork

LV distribution cables installed on to heavy duty traywork

A+B 32A under-floor commando outlets being installed

A+B 32A under-floor commando outlets being installed in Suite 1

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro update – Chillers

Chillers arrive on-site with a Rig Lift

Chillers arrive on-site with a Rig Lift

Offloading first chiller on to the pre-prepared plinths

Offloading first chiller on to the pre-prepared plinths

Preparing to position the second chiller

Preparing to position the second chiller

Both chillers in place and ready for pipework connections

Both chillers in place and ready for pipework connections

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro update – CRAC units

Computer Room Air Conditioning units (CRACs) arrive on-site

Computer Room Air Conditioning units (CRACs) arrive on-site

Unloading delivery of CRACs

Unloading delivery of CRACs

Interior view of CRAC unit

Interior view of CRAC unit

CRAC bases positioned in the Suite 1 Plant Room

CRAC bases positioned in the Suite 1 Plant Room

First CRAC unit installed on to base

First CRAC unit installed on to base

First three CRAC units installed

First three CRAC units installed

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro update – LV Switchgear and PDUs

Delivery arrives on-site

Delivery arrives on-site

Loading LV switchgear in to the Switchgear Room

Loading LV switchgear in to the Switchgear Room

Positioning first LV switchgear panels

Positioning first LV switchgear panels

Suite 1 LV panel installed and ready for testing

Suite 1 LV panel installed and ready for testing

Dual incoming 2,500A breakers on Suite 1 LV Panel

Dual incoming 2,500A breakers on Suite 1 LV Panel

PDUs installed in to Suite 1 Plant Room

PDUs installed in to Suite 1 Plant Room

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro update – FM200, power tray work and air conditioning ducting

FM200 gas installation in to Switchgear Room

FM200 gas installation in to Switchgear Room

Heavy duty tray work for LV cabling to Suite 1

Heavy duty tray work for LV cabling to Suite 1

Forming ducting for air conditioning in the comms rooms

Forming ducting for air conditioning in the comms rooms

[Digg] [Facebook] [Google] [StumbleUpon] [Email]