Computer Room Air Conditioning units (CRACs) arrive on-site
Unloading delivery of CRACs
Interior view of CRAC unit
CRAC bases positioned in the Suite 1 Plant Room
First CRAC unit installed on to base
First three CRAC units installed
FM200 gas installation in to Switchgear Room
Heavy duty tray work for LV cabling to Suite 1
Forming ducting for air conditioning in the comms rooms
Inverter pumps arrive on-site
Preparing stands for pumps
Redundant inverter driven pumps ready for piperwork connections
Starting work on pipework connections