<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Gyron Blog &#187; air conditioning</title>
	<atom:link href="http://blog.gyron.net/tag/air-conditioning/feed/" rel="self" type="application/rss+xml" />
	<link>http://blog.gyron.net</link>
	<description>Purveyors of fine quality datacentre services since 2000.</description>
	<lastBuildDate>Tue, 11 May 2010 16:56:38 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Centro Cooling efficiency</title>
		<link>http://blog.gyron.net/green/centro-cooling-efficiency/</link>
		<comments>http://blog.gyron.net/green/centro-cooling-efficiency/#comments</comments>
		<pubDate>Fri, 28 Aug 2009 15:25:59 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[General Bloggery]]></category>
		<category><![CDATA[Green Tech]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[centro]]></category>
		<category><![CDATA[efficiency]]></category>
		<category><![CDATA[green grid]]></category>
		<category><![CDATA[power]]></category>
		<category><![CDATA[PuE]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=504</guid>
		<description><![CDATA[Early on in the design stage for our new Centro datacentre, we recognised the importance of in depth monitoring, reporting and trending capabilities across the entire facility, both for troubleshooting and early warning purposes, and for analysing efficiency data.
As such, the facility is equipped with an extensive Building Management System (BMS), which tracks around 2,000 [...]]]></description>
			<content:encoded><![CDATA[<p>Early on in the design stage for our new Centro datacentre, we recognised the importance of in depth monitoring, reporting and trending capabilities across the entire facility, both for troubleshooting and early warning purposes, and for analysing efficiency data.</p>
<p>As such, the facility is equipped with an extensive Building Management System (BMS), which tracks around 2,000 variables in real time, including the status of the fire protection equipment (zoned detectors, VESDA, and FM200), leak detection system, cooling plant (CRACs, chillers, pumps/inverters), and power infrastructure (branch circuit metering, as well as meters on every outgoing way on main and distribution electrical switchgear, UPS plant and generators).</p>
<p>This level of monitoring has recently had even greater importance attached to it given the upcoming requirements for cap and trade carbon taxes, allowing us to collect data on energy usage (kWh, kW, power factor, voltage, and current) on a per-rack basis, and report this to our customers.</p>
<p>Our Centro datacentre facility has been up and running for nearly 3 months now, so we thought it would be worthwhile doing some analysis on the efficiency of our cooling equipment. We have installed highly efficient Computer Room Air Conditioning (CRAC) units, with electrically commutated (EC) fans, and have also used high efficiency over-sized inverter driven pumps, and high efficiency external packaged chillers with a higher than usual return water temperature, so we were hoping for promising figures.</p>
<p><a href="http://blog.gyron.net/wp-content/uploads/centro_cooling_graph.png" rel="lightbox[504]"><img class="aligncenter size-medium wp-image-507" title="Centro cooling efficiency graph" src="http://blog.gyron.net/wp-content/uploads/centro_cooling_graph-466x360.png" alt="Centro cooling efficiency graph" width="466" height="360" /></a></p>
<p>We&#8217;re pleased to announce that our initial analysis shows a PuE figure of <strong>1.63</strong>! We are especially happy with this as our current situation with a large number of customers still populating their racks presents several big issues with part-load efficiencies on key plant equipment, particularly UPSs and Chillers.</p>
<p>The <a href="http://www.thegreengrid.org/en/Global/Content/white-papers/The-Green-Grid-Data-Center-Power-Efficiency-Metrics-PUE-and-DCiE" target="_blank">Green Grid</a> specify:</p>
<blockquote><p>Some preliminary work indicates that many datacenters may have a PUE of 3.0 or greater, but with proper design a PUE value of 1.6 should be achievable</p></blockquote>
<p>We are continuing to improve the systems and processes in place at the Centro facility and hope to make even greater efficiency savings with additional investment in plant in the coming months.</p>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/pictures/centro-update-hv-transformer-installation-and-chiller-pipework-connections/" title="Centro update &#8211; HV transformer installation and chiller pipework connections">Centro update &#8211; HV transformer installation and chiller pipework connections</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-fm200-power-tray-work-and-air-conditioning-ducting/" title="Centro update &#8211; FM200, power tray work and air conditioning ducting">Centro update &#8211; FM200, power tray work and air conditioning ducting</a></li><li><a href="http://blog.gyron.net/pictures/centro-phase-2-fit-out-update/" title="Centro phase 2 fit-out update">Centro phase 2 fit-out update</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/green/centro-cooling-efficiency/feed/</wfw:commentRss>
		<slash:comments>3</slash:comments>
		</item>
		<item>
		<title>Mini tour of Centro datacentre</title>
		<link>http://blog.gyron.net/pictures/mini-tour-of-centro-datacentre/</link>
		<comments>http://blog.gyron.net/pictures/mini-tour-of-centro-datacentre/#comments</comments>
		<pubDate>Thu, 23 Jul 2009 07:42:41 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Centro fit-out]]></category>
		<category><![CDATA[Pictures]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[centro]]></category>
		<category><![CDATA[racks]]></category>
		<category><![CDATA[suite 1]]></category>
		<category><![CDATA[vesda]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=490</guid>
		<description><![CDATA[Now that our Centro datacentre has been successfully up and running for nearly 2 months, we&#8217;ve finally had chance to take some photos showing the completed facility.
With over 70% of the capacity of our first phase of fit-out already sold to customers, we&#8217;re already planning the roll out of additional capacity at the site. For [...]]]></description>
			<content:encoded><![CDATA[<p>Now that our Centro datacentre has been successfully up and running for nearly 2 months, we&#8217;ve finally had chance to take some photos showing the completed facility.</p>
<p>With over 70% of the capacity of our first phase of fit-out already sold to customers, we&#8217;re already planning the roll out of additional capacity at the site. For more details and pricing, contact <a href="mailto:sales@gyron.net">sales@gyron.net</a>!</p>
<div id="attachment_493" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5D-IMG_8264.JPG" rel="lightbox[490]"><img class="size-medium wp-image-493 " title="Datacentre lobby area. All lighting is motion activated to save energy." src="http://blog.gyron.net/wp-content/uploads/5D-IMG_8264-480x320.jpg" alt="Datacentre lobby area" width="480" height="320" /></a><p class="wp-caption-text">Datacentre lobby area. All lighting is motion activated to save energy.</p></div>
<div id="attachment_492" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5D-IMG_8239.JPG" rel="lightbox[490]"><img class="size-medium wp-image-492" title="Secure areas with fire panels, separate VESDA systems, and access control" src="http://blog.gyron.net/wp-content/uploads/5D-IMG_8239-480x320.jpg" alt="Secure areas with fire panels, separate VESDA systems, and access control" width="480" height="320" /></a><p class="wp-caption-text">Secure areas with fire panels, separate VESDA systems, and access control</p></div>
<div id="attachment_495" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5D-IMG_8271.JPG" rel="lightbox[490]"><img class="size-medium wp-image-495" title="Suite 1 with first two pods live, and plenty of expansion room" src="http://blog.gyron.net/wp-content/uploads/5D-IMG_8271-480x320.jpg" alt="Suite 1 with first two pods live, and plenty of expansion room" width="480" height="320" /></a><p class="wp-caption-text">Suite 1 with first two pods live, and plenty of expansion room</p></div>
<div id="attachment_494" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5D-IMG_8266.JPG" rel="lightbox[490]"><img class="size-medium wp-image-494 " title="2x 20 rack pods in Suite 1 with hot aisle containment" src="http://blog.gyron.net/wp-content/uploads/5D-IMG_8266-480x320.jpg" alt="20 rack pod in Suite 1 with hot aisle containment" width="480" height="320" /></a><p class="wp-caption-text">2x 20 rack pods in Suite 1 with hot aisle containment</p></div>
<div id="attachment_491" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5D-IMG_8233.JPG" rel="lightbox[490]"><img class="size-medium wp-image-491 " title="Suite 1 Plant Room showing DFUs, FM200 bottles and distribution boards" src="http://blog.gyron.net/wp-content/uploads/5D-IMG_8233-480x320.jpg" alt="Suite 1 Plant Room" width="480" height="320" /></a><p class="wp-caption-text">Suite 1 Plant Room showing DFUs, FM200 bottles and distribution boards</p></div>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/news/case-study-datacentre-server-relocation-migration-project/" title="UKDedicated Case Study: Anatomy of a datacentre server relocation project">UKDedicated Case Study: Anatomy of a datacentre server relocation project</a></li><li><a href="http://blog.gyron.net/green/centro-cooling-efficiency/" title="Centro Cooling efficiency">Centro Cooling efficiency</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-final-air-conditioning-works/" title="Centro update &#8211; Final air conditioning works">Centro update &#8211; Final air conditioning works</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/pictures/mini-tour-of-centro-datacentre/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Centro update &#8211; Final air conditioning works</title>
		<link>http://blog.gyron.net/pictures/centro-update-final-air-conditioning-works/</link>
		<comments>http://blog.gyron.net/pictures/centro-update-final-air-conditioning-works/#comments</comments>
		<pubDate>Wed, 27 May 2009 11:07:40 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Centro fit-out]]></category>
		<category><![CDATA[Pictures]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[centro]]></category>
		<category><![CDATA[commissioning]]></category>
		<category><![CDATA[cooling]]></category>
		<category><![CDATA[lagging]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=462</guid>
		<description><![CDATA[Related PostsCentro update &#8211; HV transformer installation and chiller pipework connectionsCentro update &#8211; ChillersCentro update &#8211; Air conditioning pump installation]]></description>
			<content:encoded><![CDATA[<div id="attachment_466" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8168.jpg" rel="lightbox[462]"><img class="size-medium wp-image-466" title="Finalising lagging for the chilled water pipework" src="http://blog.gyron.net/wp-content/uploads/5d-img_8168-480x320.jpg" alt="Finalising lagging for the chilled water pipework" width="480" height="320" /></a><p class="wp-caption-text">Finalising lagging for the chilled water pipework</p></div>
<div id="attachment_465" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8165.jpg" rel="lightbox[462]"><img class="size-medium wp-image-465" title="Setting flow rates for the chilled water valves" src="http://blog.gyron.net/wp-content/uploads/5d-img_8165-480x320.jpg" alt="Setting flow rates for the chilled water valves" width="480" height="320" /></a><p class="wp-caption-text">Setting flow rates for the chilled water valves</p></div>
<div id="attachment_464" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8160.jpg" rel="lightbox[462]"><img class="size-medium wp-image-464" title="Commissioning the air conditioning chillers" src="http://blog.gyron.net/wp-content/uploads/5d-img_8160-480x320.jpg" alt="Commissioning the air conditioning chillers" width="480" height="320" /></a><p class="wp-caption-text">Commissioning the air conditioning chillers</p></div>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/pictures/centro-update-hv-transformer-installation-and-chiller-pipework-connections/" title="Centro update &#8211; HV transformer installation and chiller pipework connections">Centro update &#8211; HV transformer installation and chiller pipework connections</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-chillers/" title="Centro update &#8211; Chillers">Centro update &#8211; Chillers</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-air-conditioning-pump-installation/" title="Centro update &#8211; Air conditioning pump installation">Centro update &#8211; Air conditioning pump installation</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/pictures/centro-update-final-air-conditioning-works/feed/</wfw:commentRss>
		<slash:comments>3</slash:comments>
		</item>
		<item>
		<title>Centro update &#8211; HV transformer installation and chiller pipework connections</title>
		<link>http://blog.gyron.net/pictures/centro-update-hv-transformer-installation-and-chiller-pipework-connections/</link>
		<comments>http://blog.gyron.net/pictures/centro-update-hv-transformer-installation-and-chiller-pipework-connections/#comments</comments>
		<pubDate>Fri, 08 May 2009 08:34:31 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Centro fit-out]]></category>
		<category><![CDATA[Pictures]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[centro]]></category>
		<category><![CDATA[cooling]]></category>
		<category><![CDATA[HV]]></category>
		<category><![CDATA[LV]]></category>
		<category><![CDATA[power]]></category>
		<category><![CDATA[substation]]></category>
		<category><![CDATA[switchgear]]></category>
		<category><![CDATA[transformer]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=454</guid>
		<description><![CDATA[Related PostsCentro update &#8211; Chiller and transformer basesCentro update &#8211; HV switchgear connectionsCentro update &#8211; HV switchgear delivery and installation]]></description>
			<content:encoded><![CDATA[<div id="attachment_455" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8074.jpg" rel="lightbox[454]"><img class="size-medium wp-image-455" title="3MVA HV transformer installed within secure compound" src="http://blog.gyron.net/wp-content/uploads/5d-img_8074-480x320.jpg" alt="3MVA HV transformer installed within secure compound" width="480" height="320" /></a><p class="wp-caption-text">3MVA HV transformer installed within secure compound</p></div>
<div id="attachment_456" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8084.jpg" rel="lightbox[454]"><img class="size-medium wp-image-456" title="HV feed from our dedicated substation being terminated" src="http://blog.gyron.net/wp-content/uploads/5d-img_8084-480x320.jpg" alt="HV feed from our dedicated substation being terminated" width="480" height="320" /></a><p class="wp-caption-text">HV feed from our dedicated substation being terminated</p></div>
<div id="attachment_459" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8101.jpg" rel="lightbox[454]"><img class="size-medium wp-image-459" title="First of 24 LV cables connecting the transformer and switchgear panels" src="http://blog.gyron.net/wp-content/uploads/5d-img_8101-480x321.jpg" alt="First of 24 LV cables connecting the transformer and switchgear panels" width="480" height="321" /></a><p class="wp-caption-text">First of 24 LV cables connecting the transformer and switchgear panels</p></div>
<div id="attachment_457" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8086.jpg" rel="lightbox[454]"><img class="size-medium wp-image-457" title="Final connections being made on chilled water pipework" src="http://blog.gyron.net/wp-content/uploads/5d-img_8086-480x320.jpg" alt="Final connections being made on chilled water pipework" width="480" height="320" /></a><p class="wp-caption-text">Final connections being made on chilled water pipework</p></div>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/pictures/centro-update-chiller-and-transformer-bases/" title="Centro update &#8211; Chiller and transformer bases">Centro update &#8211; Chiller and transformer bases</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-hv-switchgear-connections/" title="Centro update &#8211; HV switchgear connections">Centro update &#8211; HV switchgear connections</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-hv-switchgear-delivery-and-installation/" title="Centro update &#8211; HV switchgear delivery and installation">Centro update &#8211; HV switchgear delivery and installation</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/pictures/centro-update-hv-transformer-installation-and-chiller-pipework-connections/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Centro update &#8211; Chillers</title>
		<link>http://blog.gyron.net/pictures/centro-update-chillers/</link>
		<comments>http://blog.gyron.net/pictures/centro-update-chillers/#comments</comments>
		<pubDate>Tue, 28 Apr 2009 19:29:16 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Centro fit-out]]></category>
		<category><![CDATA[Pictures]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[centro]]></category>
		<category><![CDATA[chillers]]></category>
		<category><![CDATA[cooling]]></category>
		<category><![CDATA[deliveries]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=436</guid>
		<description><![CDATA[Related PostsCentro phase 2 fit-out updateCentro update &#8211; Final air conditioning worksCentro update &#8211; HV transformer installation and chiller pipework connections]]></description>
			<content:encoded><![CDATA[<div id="attachment_437" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8013.jpg" rel="lightbox[436]"><img class="size-medium wp-image-437" title="Chillers arrive on-site with a Rig Lift" src="http://blog.gyron.net/wp-content/uploads/5d-img_8013-480x320.jpg" alt="Chillers arrive on-site with a Rig Lift" width="480" height="320" /></a><p class="wp-caption-text">Chillers arrive on-site with a Rig Lift</p></div>
<div id="attachment_438" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8021.jpg" rel="lightbox[436]"><img class="size-medium wp-image-438" title="Offloading first chiller on to the pre-prepared plinths" src="http://blog.gyron.net/wp-content/uploads/5d-img_8021-480x320.jpg" alt="Offloading first chiller on to the pre-prepared plinths" width="480" height="320" /></a><p class="wp-caption-text">Offloading first chiller on to the pre-prepared plinths</p></div>
<div id="attachment_439" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8028.jpg" rel="lightbox[436]"><img class="size-medium wp-image-439" title="Preparing to position the second chiller" src="http://blog.gyron.net/wp-content/uploads/5d-img_8028-480x320.jpg" alt="Preparing to position the second chiller" width="480" height="320" /></a><p class="wp-caption-text">Preparing to position the second chiller</p></div>
<div id="attachment_440" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8046.jpg" rel="lightbox[436]"><img class="size-medium wp-image-440" title="Both chillers in place and ready for pipework connections" src="http://blog.gyron.net/wp-content/uploads/5d-img_8046-480x320.jpg" alt="Both chillers in place and ready for pipework connections" width="480" height="320" /></a><p class="wp-caption-text">Both chillers in place and ready for pipework connections</p></div>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/pictures/centro-phase-2-fit-out-update/" title="Centro phase 2 fit-out update">Centro phase 2 fit-out update</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-final-air-conditioning-works/" title="Centro update &#8211; Final air conditioning works">Centro update &#8211; Final air conditioning works</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-hv-transformer-installation-and-chiller-pipework-connections/" title="Centro update &#8211; HV transformer installation and chiller pipework connections">Centro update &#8211; HV transformer installation and chiller pipework connections</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/pictures/centro-update-chillers/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Centro update &#8211; CRAC units</title>
		<link>http://blog.gyron.net/pictures/centro-update-crac-units/</link>
		<comments>http://blog.gyron.net/pictures/centro-update-crac-units/#comments</comments>
		<pubDate>Mon, 27 Apr 2009 11:41:06 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Centro fit-out]]></category>
		<category><![CDATA[Pictures]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[centro]]></category>
		<category><![CDATA[crac]]></category>
		<category><![CDATA[deliveries]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=427</guid>
		<description><![CDATA[Related PostsCentro phase 2 fit-out updateCentro update &#8211; ChillersCentro Cooling efficiency]]></description>
			<content:encoded><![CDATA[<div id="attachment_428" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7969.jpg" rel="lightbox[427]"><img class="size-medium wp-image-428" title="Computer Room Air Conditioning units (CRACs) arrive on-site" src="http://blog.gyron.net/wp-content/uploads/5d-img_7969-480x320.jpg" alt="Computer Room Air Conditioning units (CRACs) arrive on-site" width="480" height="320" /></a><p class="wp-caption-text">Computer Room Air Conditioning units (CRACs) arrive on-site</p></div>
<div id="attachment_429" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7979.jpg" rel="lightbox[427]"><img class="size-medium wp-image-429" title="Unloading delivery of CRACs" src="http://blog.gyron.net/wp-content/uploads/5d-img_7979-480x320.jpg" alt="Unloading delivery of CRACs" width="480" height="320" /></a><p class="wp-caption-text">Unloading delivery of CRACs</p></div>
<div id="attachment_430" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7986.jpg" rel="lightbox[427]"><img class="size-medium wp-image-430" title="Interior view of CRAC unit" src="http://blog.gyron.net/wp-content/uploads/5d-img_7986-480x320.jpg" alt="Interior view of CRAC unit" width="480" height="320" /></a><p class="wp-caption-text">Interior view of CRAC unit</p></div>
<div id="attachment_431" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7991.jpg" rel="lightbox[427]"><img class="size-medium wp-image-431" title="CRAC bases positioned in the Suite 1 Plant Room" src="http://blog.gyron.net/wp-content/uploads/5d-img_7991-480x320.jpg" alt="CRAC bases positioned in the Suite 1 Plant Room" width="480" height="320" /></a><p class="wp-caption-text">CRAC bases positioned in the Suite 1 Plant Room</p></div>
<div id="attachment_432" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8003.jpg" rel="lightbox[427]"><img class="size-medium wp-image-432" title="First CRAC unit installed on to base" src="http://blog.gyron.net/wp-content/uploads/5d-img_8003-480x320.jpg" alt="First CRAC unit installed on to base" width="480" height="320" /></a><p class="wp-caption-text">First CRAC unit installed on to base</p></div>
<div id="attachment_433" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_8015.jpg" rel="lightbox[427]"><img class="size-medium wp-image-433" title="First three CRAC units installed" src="http://blog.gyron.net/wp-content/uploads/5d-img_8015-480x320.jpg" alt="First three CRAC units installed" width="480" height="320" /></a><p class="wp-caption-text">First three CRAC units installed</p></div>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/pictures/centro-phase-2-fit-out-update/" title="Centro phase 2 fit-out update">Centro phase 2 fit-out update</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-chillers/" title="Centro update &#8211; Chillers">Centro update &#8211; Chillers</a></li><li><a href="http://blog.gyron.net/green/centro-cooling-efficiency/" title="Centro Cooling efficiency">Centro Cooling efficiency</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/pictures/centro-update-crac-units/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Centro update &#8211; FM200, power tray work and air conditioning ducting</title>
		<link>http://blog.gyron.net/pictures/centro-update-fm200-power-tray-work-and-air-conditioning-ducting/</link>
		<comments>http://blog.gyron.net/pictures/centro-update-fm200-power-tray-work-and-air-conditioning-ducting/#comments</comments>
		<pubDate>Fri, 17 Apr 2009 16:42:48 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Centro fit-out]]></category>
		<category><![CDATA[Pictures]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[centro]]></category>
		<category><![CDATA[duct]]></category>
		<category><![CDATA[power]]></category>
		<category><![CDATA[traywork]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=408</guid>
		<description><![CDATA[Related PostsCentro Cooling efficiencyCentro update &#8211; HV transformer installation and chiller pipework connectionsCentro update &#8211; LV power connections]]></description>
			<content:encoded><![CDATA[<div id="attachment_412" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7832.jpg" rel="lightbox[408]"><img class="size-medium wp-image-412" title="FM200 gas installation in to Switchgear Room" src="http://blog.gyron.net/wp-content/uploads/5d-img_7832-480x320.jpg" alt="FM200 gas installation in to Switchgear Room" width="480" height="320" /></a><p class="wp-caption-text">FM200 gas installation in to Switchgear Room</p></div>
<div id="attachment_413" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7835.jpg" rel="lightbox[408]"><img class="size-medium wp-image-413" title="Heavy duty tray work for LV cabling to Suite 1" src="http://blog.gyron.net/wp-content/uploads/5d-img_7835-480x320.jpg" alt="Heavy duty tray work for LV cabling to Suite 1" width="480" height="320" /></a><p class="wp-caption-text">Heavy duty tray work for LV cabling to Suite 1</p></div>
<div id="attachment_414" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7918.jpg" rel="lightbox[408]"><img class="size-medium wp-image-414" title="Forming ducting for air conditioning in the comms rooms" src="http://blog.gyron.net/wp-content/uploads/5d-img_7918-480x319.jpg" alt="Forming ducting for air conditioning in the comms rooms" width="480" height="319" /></a><p class="wp-caption-text">Forming ducting for air conditioning in the comms rooms</p></div>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/green/centro-cooling-efficiency/" title="Centro Cooling efficiency">Centro Cooling efficiency</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-hv-transformer-installation-and-chiller-pipework-connections/" title="Centro update &#8211; HV transformer installation and chiller pipework connections">Centro update &#8211; HV transformer installation and chiller pipework connections</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-lv-power-connections/" title="Centro update &#8211; LV power connections">Centro update &#8211; LV power connections</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/pictures/centro-update-fm200-power-tray-work-and-air-conditioning-ducting/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Centro update &#8211; Air conditioning pump installation</title>
		<link>http://blog.gyron.net/pictures/centro-update-air-conditioning-pump-installation/</link>
		<comments>http://blog.gyron.net/pictures/centro-update-air-conditioning-pump-installation/#comments</comments>
		<pubDate>Mon, 30 Mar 2009 17:37:47 +0000</pubDate>
		<dc:creator>Robin Balen - Gyron</dc:creator>
				<category><![CDATA[Centro fit-out]]></category>
		<category><![CDATA[Pictures]]></category>
		<category><![CDATA[air conditioning]]></category>
		<category><![CDATA[centro]]></category>
		<category><![CDATA[cooling]]></category>
		<category><![CDATA[pipework]]></category>
		<category><![CDATA[pumps]]></category>

		<guid isPermaLink="false">http://blog.gyron.net/?p=361</guid>
		<description><![CDATA[Related PostsCentro update &#8211; Final air conditioning worksCentro update &#8211; HV transformer installation and chiller pipework connectionsCentro update &#8211; Chillers]]></description>
			<content:encoded><![CDATA[<div id="attachment_362" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7709.jpg" rel="lightbox[361]"><img class="size-medium wp-image-362" title="Inverter pumps arrive on-site" src="http://blog.gyron.net/wp-content/uploads/5d-img_7709-480x320.jpg" alt="Inverter pumps arrive on-site" width="480" height="320" /></a><p class="wp-caption-text">Inverter pumps arrive on-site</p></div>
<div id="attachment_363" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7723.jpg" rel="lightbox[361]"><img class="size-medium wp-image-363" title="Preparing stands for pumps" src="http://blog.gyron.net/wp-content/uploads/5d-img_7723-480x320.jpg" alt="Preparing stands for pumps" width="480" height="320" /></a><p class="wp-caption-text">Preparing stands for pumps</p></div>
<div id="attachment_364" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7743.jpg" rel="lightbox[361]"><img class="size-medium wp-image-364" title="Redundant inverter driven pumps ready for piperwork connections" src="http://blog.gyron.net/wp-content/uploads/5d-img_7743-480x320.jpg" alt="Redundant inverter driven pumps ready for piperwork connections" width="480" height="320" /></a><p class="wp-caption-text">Redundant inverter driven pumps ready for piperwork connections</p></div>
<div id="attachment_373" class="wp-caption aligncenter" style="width: 490px"><a href="http://blog.gyron.net/wp-content/uploads/5d-img_7816.jpg" rel="lightbox[361]"><img class="size-medium wp-image-373" title="Starting work on pipework connections" src="http://blog.gyron.net/wp-content/uploads/5d-img_7816-480x320.jpg" alt="Starting work on pipework connections" width="480" height="320" /></a><p class="wp-caption-text">Starting work on pipework connections</p></div>
<h3  class="related_post_title">Related Posts</h3><ul class="related_post"><li><a href="http://blog.gyron.net/pictures/centro-update-final-air-conditioning-works/" title="Centro update &#8211; Final air conditioning works">Centro update &#8211; Final air conditioning works</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-hv-transformer-installation-and-chiller-pipework-connections/" title="Centro update &#8211; HV transformer installation and chiller pipework connections">Centro update &#8211; HV transformer installation and chiller pipework connections</a></li><li><a href="http://blog.gyron.net/pictures/centro-update-chillers/" title="Centro update &#8211; Chillers">Centro update &#8211; Chillers</a></li></ul>]]></content:encoded>
			<wfw:commentRss>http://blog.gyron.net/pictures/centro-update-air-conditioning-pump-installation/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
	</channel>
</rss>
