Centro update – LV Switchgear and PDUs

Delivery arrives on-site

Delivery arrives on-site

Loading LV switchgear in to the Switchgear Room

Loading LV switchgear in to the Switchgear Room

Positioning first LV switchgear panels

Positioning first LV switchgear panels

Suite 1 LV panel installed and ready for testing

Suite 1 LV panel installed and ready for testing

Dual incoming 2,500A breakers on Suite 1 LV Panel

Dual incoming 2,500A breakers on Suite 1 LV Panel

PDUs installed in to Suite 1 Plant Room

PDUs installed in to Suite 1 Plant Room