Centro update – FM200, power tray work and air conditioning ducting

FM200 gas installation in to Switchgear Room

FM200 gas installation in to Switchgear Room

Heavy duty tray work for LV cabling to Suite 1

Heavy duty tray work for LV cabling to Suite 1

Forming ducting for air conditioning in the comms rooms

Forming ducting for air conditioning in the comms rooms