Contractors continuing to install dry walling at the south side of the facility

Taping and filling the Goods In area and Switchgear Room

Detail of the jumbo stud walling, with steel and plywood reinforcement, and a minimum of 1 hour fire rating throughout the facility

Starting to lay out walling to form rooms at the north side of the facility