Mini tour of Centro datacentre

Now that our Centro datacentre has been successfully up and running for nearly 2 months, we’ve finally had chance to take some photos showing the completed facility.

With over 70% of the capacity of our first phase of fit-out already sold to customers, we’re already planning the roll out of additional capacity at the site. For more details and pricing, contact sales@gyron.net!

Datacentre lobby area

Datacentre lobby area. All lighting is motion activated to save energy.

Secure areas with fire panels, separate VESDA systems, and access control

Secure areas with fire panels, separate VESDA systems, and access control

Suite 1 with first two pods live, and plenty of expansion room

Suite 1 with first two pods live, and plenty of expansion room

20 rack pod in Suite 1 with hot aisle containment

2x 20 rack pods in Suite 1 with hot aisle containment

Suite 1 Plant Room

Suite 1 Plant Room showing DFUs, FM200 bottles and distribution boards

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

New contact address details for Gyron

Following the opening of Gyron’s new Centro datacentre facility in Hemel Hempstead, our administrative staff have relocated to our new on-site offices. As such, please update your records with our new postal address, to be used for all correspondence (including cheque payments and legal documents):

Gyron Internet Ltd
3 Centro
Boundary Way
Hemel Hempstead
HP2 7SU

All other contact details, including phone numbers, remain the same. We also continue to operate a 24/7 NOC at our on-site offices in the LHC, in London Docklands, to support our customers there.

Please note that the Registered Office for Gyron Internet Ltd has also been updated to the above address.

If you have any queries regarding this change please contact our accounts team on billing@gyron.net or 0845 888 6900 during office hours.

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

Gyron’s new Centro datacentre facility featured in HotLINX magazine

Our new Centro facility is featured in the latest edition of the London Internet Exchange‘s HotLINX magazine. You can click the image below to see the article, or download the entire magazine here!

Centro feature in HotLINX 18

Centro feature in HotLINX 18

Continue reading ‘Gyron’s new Centro datacentre facility featured in HotLINX magazine’

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

Centro update – Final commissioning works

HV feed from EDF fully tested and energised

HV feed from EDF fully tested and energised

UPS batteries ready for installation and testing

UPS batteries ready for installation and testing

Final UPS connections and testing

Final UPS connections and testing

Access control system installed and tested

Access control system installed and tested

Splicing and testing fibre connections for our DWDM ring

Splicing and testing fibre connections for our DWDM ring

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

Centro update – Final air conditioning works

Finalising lagging for the chilled water pipework

Finalising lagging for the chilled water pipework

Setting flow rates for the chilled water valves

Setting flow rates for the chilled water valves

Commissioning the air conditioning chillers

Commissioning the air conditioning chillers