Centro update – Biometric man-trap

Bullet proof glass sliding doors awaiting installation

Bullet proof glass sliding doors awaiting installation

Installing door frame in to opening

Installing door frame in to opening

Installing roof on to door

Installing roof on to man-trap

Secure door portal installed and ready for use!

Biometric man-trap installed and ready for use!

Door protected, with reinstatement works underway

Door protected whilst reinstatement works are underway

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

Centro update – HV switchgear connections

Gyron sign on HV substation enclosure

Gyron sign on HV substation enclosure

Cross section through the HV cabling

Cross section through the HV cabling

Testing redundant HV connections in to the switchgear

Testing redundant HV connections in to the switchgear

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]

Centro update – FM200 and VESDA installation

Fabricating FM200 gas pipework

Fabricating FM200 gas pipework

FM200 gas bottle and pipework installed in to South Comms Room

FM200 gas bottle and pipework installed in to South Comms Room

Initial wiring and installation of FM200 fire panel and VESDA unit

Initial wiring and installation of FM200 fire panel and VESDA unit

[Digg] [Facebook] [StumbleUpon] [Twitter] [Email]