Monthly Archive for March, 2009

Page 2 of 2

Centro update – New deliveries

First of two articulated lorrys delivering initial deployment of racks

First of two articulated lorries delivering initial consignment of racks

Racks starting to be unloaded

Racks starting to be unloaded

Racks unloaded and awaiting deployment

Initial consignment of racks unloaded and awaiting future deployment

Tantalising peek at our biometric entry portal

Tantalising peek at our biometric entry portal, freshly delivered from Italy

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro fit out update – Internal partition walls

Contractors continuing to install dry walling

Contractors continuing to install dry walling at the south side of the facility

Taping and filling the Goods In area and Switchgear Room

Taping and filling the Goods In area and Switchgear Room

Starting to lay out walling to form rooms at the North side of the facility

Detail of the jumbo stud walling, with steel and plywood reinforcement, and a minimum of 1 hour fire rating throughout the facility

Starting to lay out walling to form rooms at the North side of the facility

Starting to lay out walling to form rooms at the north side of the facility

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro office fit-out time lapse video

As previously promised, here’s a time lapse video of the Centro office fit-out… about 2 months work compressed in to two and a half minutes!

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

Centro update – HV power and substation works

Forming the concrete base for HV substation

Constructing the formwork for the HV substation concrete base

Concrete arrives on-site

Concrete arrives on-site

Pouring concrete for substation base

Pouring concrete for substation base

Finishing the concrete base for the HV substation

Finishing the concrete base for the HV substation

Concrete base with new duct installation to dedicated transformer

Concrete base with new duct installation underway to dedicated transformer

[Digg] [Facebook] [Google] [StumbleUpon] [Email]

HV power cable delivery at Centro

The HV cable has arrived at site, ready for our contractors to pull in to our new ducts. The cable will connect our dedicated on-site substation to the electrity board’s 11,000 volt network via diverse feeder cables.

HV cable arrives at Centro

HV cable arrives at Centro

HV cable arrives at Centro

HV cable arrives at Centro

HV cable arrives at Centro

HV cable arrives at Centro

HV cable arrives at Centro

HV cable arrives at Centro